Construction of handia barrage project on turn key basis including construction of handia barrage, construction of power house for 25 MW generation and piped irrigation system to supply water through pressurized pipeline system through for micro irrigation (Drip / sprinkler) to deliver at farmers fields with a duty of 0.36 lit / sec / a, OMS at 20 Ha. chak with 10 times duty from 20 ha. to 2.5 ha. chak with al least 23 meter residual head at highest point of each 2.50 ha chak with total power requirement of 19.89 MW in district culturable command area of 35000ha, out of gross command area 44668 ha. with all ancillary works as per detail scope of work. This work also includes management, operation & maintenance (MOM) for the period of 60 months after completion of project.
Construction of handia barrage project on turn key basis including construction of handia barrage, construction of power house for 25 MW generation and piped irrigation system to supply water through pressurized pipeline system through for micro irrigation (Drip / sprinkler) to deliver at farmers
Barrage Tenders, Diversified Power Plant Stores And Spares Tenders, Irrigation System Tenders