Tftr rehabilitation of weak formation for a length of 18.044 km (tftr with blanketing material in continuous stretch by diversion of traffic in tripling/doubling section (complete/in progress) gdr-bza (dn) = 18.044 km; at various locations.
Tftr: Rehabilitation of Weak Formation for a Length of 18.04......
Track Work Tenders