Malkapur to shegaon section- balance work of heavy repairs to drain in cutting between (i) km 498/21 to 499/09=2x800 (up &dn) =1600m, (ii) km 500/15 to 500/01=2x500 (up &dn) =1000m (iii)km 501/13 to 501/17 =2x150 (up &dn) =300m. (iv) km 503/09 to 503/17=2x270(up &dn) =540m (v) km 506/23 to 507/01=2x500 (up &dn) =1000m & ends 5x2x2x10=200m.(total length 4700m) zbb-2020-21. shegaon-balance work of heavy repairs to water supply pipe line from jungle well to rcc tank at dn side colony with repairs to existing water supply arrangement and boundary stones to prevent railway land. (zbb- 2021-22)
Malkapur to Shegaon Section:- Balance Work of Heavy Repairs ......
Drainage Tenders, Pipeline Project Tenders, Stone Tenders, Tank Tenders, Water Supply Tenders