Converting 13 chiller chambers to controlled atmosphere (ca) chambers along with repairs commissioning of ica panel, co2 scrubber, nitrogen plant, pneumatic valves, replacement of cooling coil of evaporating/ahu unds including sealing of chamber etc. complete as required for ca chamber operation at ca stores al fhel, hsiidc industrial area.
Converting 13 chiller chambers to controlled atmosphere (ca) chambers along with repairs commissioning of ica panel, co2 scrubber, nitrogen plant, pneumatic valves, replacement of cooling coil of evaporating/ahu unds including sealing of chamber etc. complete as required for ca chamber operation at
Chemical Machinery Tenders, Civil Work Tenders, Control Panel Tenders, Refrigerator Tenders, Valve Tenders