Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 131.708 lbcm of in-situ ob (which includes 1.341 lbcm of top soil, 117.081 lbcm of hard ob & 13.286 lbcm of coal), excavation of 4.377 lbcm of top soil from external dump area and re-handling of 0.742 lcm loose ob & top soil with conventional equipment and additional works viz., 500 shovel hours & 5500 rmt of drilling at jvr oc-ii mine, kgm area during a period of 15 months.
Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 131.708 lbcm of in-situ ob (which includes 1.341 lbcm of top soil, 117.081 lbcm of hard ob & 13.286 lbcm of coal), excavation of 4.377 lbcm of top soil from external dump area and re-handling of 0.742 lcm loose
Drilling Work Tenders, Excavation Work Tenders, Loading Work Tenders, Plant Machinery Tenders, Shovel Tenders, Transportation Work Tenders