Rehabilitation and up-gradation to Lane with paved shoulder of Rewa Beohari-Tetka Mod Section of SH-57 rainy (From Ch. 0.00 to 18.55 Km, season)Construction of Baghwar Canal Bridge from Ch. 32.60 to 33.00 Km. and Ch. 40.45 to 111.50 Km, Design length 90.00 Km.) <br />1 BT Renewal Work on Beohari <br />1 Shahdol Road Total length 17.5 Km of (Excluding 5.5 mtr. section in (Km. 89,94 (600m), Rainy 113, 114, 115, 117 to 119, 121 to 123, Season) 127, 128 (500 m), 131, 143, 151, (400m) 153,160, 161). (2nd Call)
Rehabilitation and up-gradation to Lane with paved shoulder of Rewa Beohari-Tetka Mod Section of SH-57 rainy (From Ch. 0.00 to 18.55 Km, season)Construction of Baghwar Canal Bridge from Ch. 32.60 to 33.00 Km. and Ch. 40.45 to 111.50 Km, Design length 90.00 Km.)
1 BT Renewal Work on Beohari
Bridge Tenders, Road Tenders