Extraction of 14.00 lakh tonnes (lt) of coal over a period of 06 apps on cost per tonne basis by using intermediate technology i.e. drilling & blasting and loading with suitable capacity sdls at kasipet 2 incline, mandamarri area
Extraction of 14.00 lakh tonnes (lt) of coal over a period of 06 apps on cost per tonne basis by using intermediate technology i.e. drilling & blasting and loading with suitable capacity sdls at kasipet 2 incline, mandamarri area
Arms/Ammunation Equipment Tenders, Drilling Work Tenders, Loading Work Tenders, Mining Tenders