Construction of 4-lane elevated road as a part of jp ganga path digha to deedarganj from nurrudin ghat ch. 16 plus 975.79 km to dharamshala ghat ch. 19 plus 890 km length 2.914 km with allied facilities and widening and strengthening of existing road to 4-lane from the junction of jp ganga path at deedarganj ch.20 plus 500km to rob approach on sh-106 old nh-30 length-750 mtr. and development of 4 lane road from sahib railway station ch. 0 plus 000 to ghat ch.1 plus 550 in replacement of existing old railway line of sahib-patna ghat at in the state of bihar on epc mode.
Construction of 4-lane elevated road as a part of jp ganga path digha to deedarganj from nurrudin ghat ch. 16 plus 975.79 km to dharamshala ghat ch. 19 plus 890 km length 2.914 km with allied facilities and widening and strengthening of existing road to 4-lane from the junction of jp ganga path at
Road Tenders