4-laning of tejajinagar - balwara section of nh-347bg (indore to boregaon- pkg ii) design ch. 9.000 to design ch. 42.400 (length 33.400 km) under bharatmala pariyojana phase-i in madhya pradesh to be executed on hybrid annuity mode
4-laning of tejajinagar - balwara section of nh-347bg (indore to boregaon- pkg ii) design ch. 9.000 to design ch. 42.400 (length 33.400 km) under bharatmala pariyojana phase-i in madhya pradesh to be executed on hybrid annuity mode
Road Tenders