Construction of foundation and substructure of major bridge no. 5(1x 30.50m composite girder at ch. 1840.00), bridge no. 6(1x 30.50m composite girder at ch. 2070.00), bridge no. 7(3x 30.5m composite girder at ch. 2600.00),bridge no. 11(1 x 61.0m steel through girder at ch. 4750.00), bridge no. 12(1 x 76.20m steel through girder at ch 5160.00), bridge no. 14(2x 30.50m composite girder at ch. 5853.00), bridge no. 18(1x 18.30m composite girder at ch. 7350.00) between arariya court and bansbari halt station and bridge no. 6a(1x 30.5m composite girder at ch. 2325.00), bridge no 8a(3x 30.5m composite girder at ch. 2985.00) between arariya and rahmatpur station of y-connection including earthwork and blanketing 50m both sides in the approaches, protection work and other ancillary works in connection with new bg line project from araria to galgalia of n.f. railway (construction).
Construction of foundation and substructure of major bridge no. 5(1x 30.50m composite girder at ch. 1840.00), bridge no. 6(1x 30.50m composite girder at ch. 2070.00), bridge no. 7(3x 30.5m composite girder at ch. 2600.00),bridge no. 11(1 x 61.0m steel through girder at ch. 4750.00), bridge no. 12(1
Bridge Tenders, Earth Work Tenders, Foundation Tenders, Road Tenders, Structure Work Tenders