Upgradation of 6 mld stp (mbbr based ) at sohna town district gurugram as per the latest required parameters/ standards after commissioning & 3 years o&m thereafter on design build operate (dboo) and all other works contingent thereto.
Upgradation of 6 mld stp (mbbr based ) at sohna town district gurugram as per the latest required parameters/ standards after commissioning & 3 years o&m thereafter on design build operate (dboo) and all other works contingent thereto.
Sewage Treatment Plant Tenders