Construction of four lane divided carriageway with paved shoulder from patan (near rajpur) at km 52.000 (design) to gojariya at km 128.940 (design), a length of 76.940 km (pkg ii) of nh-68 in gujarat under nh(o) on epc mode
Construction of four lane divided carriageway with paved shoulder from patan (near rajpur) at km 52.000 (design) to gojariya at km 128.940 (design), a length of 76.940 km (pkg ii) of nh-68 in gujarat under nh(o) on epc mode
Road Tenders