Construction of raw water collection sump of capacity 305 ki, 6mld water treatment plant, 23 hp clear water pumps and motors with 36m head of 50% stand bye, providing, laying, jointing and testing & commissioning of 300 mm dia 14755 m k-7 raw water gravity main & 30 m clear water pumping main di k-9 300 mm dia, with all required valves & specials, all allied civil works, rcc mbrs 520 kl, clear water gravity main of k-7 d.i.pipe 100mm =25601, 150mm =2301, 200mm =563, 250mm =9782, 300mm =15646, 350mm =33728, including boundary wall around wtp campus ,cc road to faciliated for movement of goods and materials, providing and fixing bulk flow meters including trial run of entire scheme for 6 month after completion of all components of the scheme including chemicals, staff, o & m of entire scheme for 5 years with defect liabilities period of 1 year
Construction of raw water collection sump of capacity 305 ki, 6mld water treatment plant, 23 hp clear water pumps and motors with 36m head of 50% stand bye, providing, laying, jointing and testing & commissioning of 300 mm dia 14755 m k-7 raw water gravity main & 30 m clear water pumping main di
Lab Equipment Tenders, Motor Tenders, Pipeline Project Tenders, Pump Tenders, Sump Tenders, Valve Tenders, Wall Tenders, Water Treatment Plant Tenders