Under the kelp project, AIBP in the minor and kathali distribution canals and their minor canals in the sadhya area of the chhora distribution canal – developed under is 4170.00 construction of kada and water management structures from underground pipeline system in the agricultural area of big warehouse and chhichhorthmaria institution, necessary survey planning, design, drawing, layout plant, map of villages for estimations, ledger, measles B-1 etc. Collection of UGPL from revenue department preparation of maps for the complete layout planning of the system, obtaining consent from the farmers concerned for the construction of works, laying out and collecting 10 % of the function grant from the concerned farmers for decoration and water management work, after layout, G.P.L. According to the specification of the water resources department for the completeness of the system and following the prescribed norms, UPVC construction of pipelines, necessary valves etc at all the designated points and construction of necessary valves etc for the successful water flow and construction of micro-irrigation system as per the norms in 10% of the area (4170.00 ha.) from the proposed 4170 (necessary for all works) for all the materials including lead lift of machines completely constructed kaha drains and water management works including all types of arrangements required for irrigation, including management etc or continuous evaluation by third party from state level authorized organization/firm and start the above dedication works till the completion of the above work, as per the prescribed guide line with the concerned farmers, villagers and to be circulated from time to time. According to the departmental orders, conducting workshops, seminars, training, demonstration and awareness programs for public participation and responsibility of farmers, implementation and making farmers familiar with the schemes and facilities received from agriculture, horticulture, sericulture according to the goal of pradhan mantri krishi sinchayee yojna. Implementation of awareness programs involves going to action. <br />Hindi
Under the kelp project, AIBP in the minor and kathali distribution canals and their minor canals in the sadhya area of the chhora distribution canal – developed under is 4170.00 construction of kada and water management structures from underground pipeline system in the agricultural area of big
Advertisement Service Tenders, Canal Work Tenders, Consultancy Service Tenders, Drainage Tenders, Drawing Tenders, Irrigation System Tenders, Pipeline Project Tenders, Project Management Services Tenders, Survey Work Tenders, Training Tenders, Valve Tenders, Water Supply Tenders