Construction of ezulwini sustainable water supply system (package a). <br /> ?potable water storage reservoir 15ml circular post tensioned concrete reservoir at ezulwini. <br /> ?completion of treated water gravity mains ( 640m of dn 500 ductile iron pipes of which 960m has already been laid. total length of pipeline is 1.6km). <br /> access road to reservoir. <br /> break pressure tank (100m3) and pressure reducing valves.
Please refer tender notice/documents for more details.
M S Pipe Tenders, Pipeline Project Tenders, Reservoir Tenders, Tank Tenders, Valve Tenders, Water Supply System Tenders