Execution of various p-way works in connection with (i) through rail renewal (primary) of existing 52kg 90 uts rails laid on psc-14 sleepers with new 60 kg 110 hh rails for a length of 30.000 km from km 15.435 to km 81.500 in patches between koraput (ex) totikiri (ex), (ii)through ballast renewal including deep screening and raising of ballast cushion to standard for a length of 32.458 km. from km. 3.16 to 162.918 (in patches) and through turn out renewal (fsl only) at various stations on koraput - rayagada line under the jurisdiction of assistant divisional engineer/laxmipur of waltair division.
Execution of various p-way works in connection with (i) through rail renewal (primary) of existing 52kg 90 uts rails laid on psc-14 sleepers with new 60 kg 110 hh rails for a length of 30.000 km from km 15.435 to km 81.500 in patches between koraput (ex) totikiri (ex), (ii)through ballast renewal
Ballast Tenders, Track Work Tenders