Installation of 0.60 km submarine cable at padma branch river under shariatpur pbs through (horizontal direction drilling) hdd boaring.
1) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 05 years. 2) The minimum specific experience as a Prime Contractor in construction works of carrying, installation, laying, testing & commissioning of 33/11/6.35KV Sub-Marine
Drilling Work Tenders, Wire And Cable Tenders