Sinking of 200mm dia (8th) gravel packed production well using mud rotary drilling Rig, with PVC casing pipe at primary processing center(PPC).
Sinking of 200mm dia (8th) gravel packed production well using mud rotary drilling Rig, with PVC casing pipe at primary processing center(PPC).
Tube Well Tenders, Well Work Tenders