Surat Lignite Power Plant –4X125 MW, Unit <br /> I to IV Biennial Rate Contract for; PACKAGE-IDigging, loading, transporting, shifting & unloading of drained Bed Material from Boiler floors and PACKAGE-IIAccumulation, removal, transporting & unloading spilled Ash from ESP & Boiler floors of Power Plant to designated locations(Year 2021-2023).
Surat Lignite Power Plant –4X125 MW, Unit
I to IV Biennial Rate Contract for; PACKAGE-IDigging, loading, transporting, shifting & unloading of drained Bed Material from Boiler floors and PACKAGE-IIAccumulation, removal, transporting & unloading spilled Ash from
Ash Tenders, Loading Work Tenders, Transportation Work Tenders, Well Work Tenders