Construction of Cut & Cover Tunnel No. 1C (Approx. length-90m) at} Ch. 6.556 km to 6.640 km, C&C No. 2A (Approx. length - 50m) at Ch. 6.550 km to 6.640 km., Balance works of C&C No. 1B(Approx. Jength- 150m-RCC Box) at Ch. 6.750 km to 6.90 km, C&C No. AO (Approx. iength - 145m) at Ch. 0.772 km to 0.9414 km and balance works of UG Tunnel No. 4 (Side Drains, Trolley Refuges. Excavation & Lining} at Ch. 2.054 km - 3.932 km, UG Tunnel No. 1A (UG Lining of Approx. Length 134m) at Ch. 4.376 km to 4.510 km and UG Tunnel No. 2 (UG Lining off Approx. Length 460m} at Ch. 7.123 km to 7.583 km. including all related ancillary works.
Construction of Cut & Cover Tunnel No. 1C (Approx. length-90m) at} Ch. 6.556 km to 6.640 km, C&C No. 2A (Approx. length - 50m) at Ch. 6.550 km to 6.640 km., Balance works of C&C No. 1B(Approx. Jength- 150m-RCC Box) at Ch. 6.750 km to 6.90 km, C&C No. AO (Approx. iength - 145m) at Ch. 0.772 km to
Civil Work Tenders, Drainage Tenders, Excavation Work Tenders, Lining Work Tenders, Tunnel Work Tenders