Supply and Fabricate the Saturator Weldment, Shtc - saturator purchase.
the Work is to Supply and Fabricate the Saturator Weldment. Refer to the Drawing Details for Dimensions and Bill of Material. the Materials to Be Upgrade From C276 to C22. the Plate Thickness to Be Increased From ¼” to 3/8”. the Contractor is to Supply, Fabricate and Test the Welding Joints for the
Fabrication Work Tenders, Welding Electrode and Stores Tenders