Engineering, detailed design approved meeting, documents, procurements, FAT system intergration, supervision on installations, sat, isat, pre-commissioning, commissioning, spare parts, training course, test run activities, documentations, & guarantee) for the main control system, HMIs, seven remote terminals units (RTU) with cu/fo converters, system integration items, the leak detection system, two de-pressuring skids, field instruments, upss, batteries, cables, fitting & termination boxes, telecommunication, pidss (pipeline intrusion detection security system), closes circuit television (CCTV), access control systems (ACS) & environment monitoring systems and all accessories required related above as outlined in the followings specifications with (electric, mechanical, inspection, process & civl) requirements and attachments no. a,b,c in order to monitoring & control crude oil pipeline with length 80 kilometer from west QURNA-1 to Tuba site plus branch of oil pipeline to PS1 Site (4 km).
Please refer tender notice/documents for more details.
Battery and Cell Tenders, C C T V System Tenders, Civil Work Tenders, Consultancy Service Tenders, Control Panel Tenders, Converter Tenders, Detector Tenders, Diversified Electrical Spares And Stores Tenders, Enviromental Chamber Tenders, Inspection Service Tenders, Man Power Tenders, Mechanical Equipment Tenders, Other Electronic Devices Tenders, Pipeline Project Tenders, Plant Machinery Tenders, Project Management Services Tenders, Security Equipment Tenders, Surveillance System Tenders, Telecommunication Stores Tenders, Training Tenders, U P S Tenders, Wire And Cable Tenders