Widening to 2 (two) lane with hard shoulder to tuivai section of nh 102b from design chain age 69.875 km to 121.769 km (pkg-3) in the state of manipur on engineering, procurement and construction (epc) mode.
Widening to 2 (two) lane with hard shoulder to tuivai section of nh 102b from design chain age 69.875 km to 121.769 km (pkg-3) in the state of manipur on engineering, procurement and construction (epc) mode.
Road Tenders