Sw-i construction of trolley refuges 200 nos. in connection with ctr(p) for a length of 26.108 km sw-ii construction of drain for a length of 6 km in connection with ctr(p) for a length of 26.108 km. sw-iii construction of ballast retaining wall for a length of 1000m in connection with ctr(p) for a length of 26.108 km. maintenance period 3 months
Sw-i construction of trolley refuges 200 nos. in connection with ctr(p) for a length of 26.108 km sw-ii construction of drain for a length of 6 km in connection with ctr(p) for a length of 26.108 km. sw-iii construction of ballast retaining wall for a length of 1000m in connection with ctr(p) for a
Civil Work Tenders, Wall Tenders