Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 320.873 lbcm of in-situ hard ob (which includes 1.620 lbcm of coal) with conventional equipment and additional works, viz., 10,000 rmt of drilling, 1000 shovel hours and 1000 dozer hours at rg oc-ii extension project, rg-iii area for a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 320.873 lbcm of in-situ hard ob (which includes 1.620 lbcm of coal) with conventional equipment and additional works, viz., 10,000 rmt of drilling, 1000 shovel hours and 1000 dozer hours at rg oc-ii extension
Dozer Tenders, Drilling Work Tenders, Excavation Work Tenders, Loading Work Tenders, Shovel Tenders, Transportation Work Tenders