Construction of uni-directional tunnel i.e. length of 2.64/2.63km and its approach road from km 6.405 to km 12.850 of total length 6.445 km nh-244 in on sudhmahadev - daranga section on nh-244 in the ut of jammu and kashmir on epc mode (pkg - ii).
Construction of uni-directional tunnel i.e. length of 2.64/2.63km and its approach road from km 6.405 to km 12.850 of total length 6.445 km nh-244 in on sudhmahadev - daranga section on nh-244 in the ut of jammu and kashmir on epc mode (pkg - ii).
Road Tenders, Tunnel Work Tenders