Requirement : |
Survey, investigation, preparation of designs, drawings, construction of head works including intake canal, jackwell cum pump house, pumping machineries, electrical sub-station, transmission line, terminal bay, rising main, delivery chamber etc, and construction of pipe distribution network including structures and scada compatible sluice valves, butterfly valves, flow meters, discharge control meters and air valves, scour valves,providing intermediate sump cum pump house including required c |