Package ii diversion of flood water from the pennaiyar river by excavation of a new canal from the right side canal from l.s. 7.00 k.m. to 50.65 k.m. and left side canal from l.s. 5.40 k.m. to 22.675 k.m. and branch canals of the existing ennekol anicut to the drought prone sub basin areas in krishnagiri and dharmapuri districts.
Package ii diversion of flood water from the pennaiyar river by excavation of a new canal from the right side canal from l.s. 7.00 k.m. to 50.65 k.m. and left side canal from l.s. 5.40 k.m. to 22.675 k.m. and branch canals of the existing ennekol anicut to the drought prone sub basin areas in
Canal Work Tenders, Dam Work Tenders, Excavation Work Tenders