Package i diversion of flood water from the pennaiyar river by excavation of a new canal from the right side canal from l.s. 0 k.m. to 7.00 k.m. and left side canal from l.s. 0 k.m. to 5.40 k.m. of the existing ennekol anicut to the drought prone sub basin areas in krishnagiri and dharmapuri districts.
Package i diversion of flood water from the pennaiyar river by excavation of a new canal from the right side canal from l.s. 0 k.m. to 7.00 k.m. and left side canal from l.s. 0 k.m. to 5.40 k.m. of the existing ennekol anicut to the drought prone sub basin areas in krishnagiri and dharmapuri
Civil Work Tenders, Excavation Work Tenders