Construction of four lane divided carriageway with paved shoulder from patan (near khan sarover lake) to gojariya km 49.775 (design) to km 128.950 (design) length 79.175 km of nh-68 in the state of gujarat under nhdp v on epc mode.
Construction of four lane divided carriageway with paved shoulder from patan (near khan sarover lake) to gojariya km 49.775 (design) to km 128.950 (design) length 79.175 km of nh-68 in the state of gujarat under nhdp v on epc mode.
Road Tenders