Development of six lane access-controlled highway from design chainage 8.130 near mohand to 16.380 daat kali tunnel of ganeshpur section of nh-72a in the state of uttar pradesh and uttarakhand under bmp on epc mode (package-2). at Dehradun,Uttaranchal,India
Classified in :
#Road Repair
Key Values
Worth | : | ₹ 8384400000.0 |
EMD | : | Refer Document |
Doc Fees | : | ₹ 90000.0 |
Key Date
Due on | : | 01-Dec-2020 |
Days to go | : | -1674 Days |
Opening on | : | 02-Dec-2020 |
Published on | : | 17-Oct-2020 |
Key Location
Location | : | Dehradun,Uttaranchal,India |
Address | : |
![]() |