Construction of bg tunnel no. 5 at km 19/820 to 20/150 (length = 330.00m) and tunnel no. 6 at km 21/200 to 21/637 (length = 437.00m), 2.0 km approach road connecting nh-37, 600m drain, retaining walls and other ancillary works in between station kamalajari-byrnihat including earthwork in cutting to make profile as per bg standard in connection with tetelia-byrnihat new line project.
Construction of bg tunnel no. 5 at km 19/820 to 20/150 (length = 330.00m) and tunnel no. 6 at km 21/200 to 21/637 (length = 437.00m), 2.0 km approach road connecting nh-37, 600m drain, retaining walls and other ancillary works in between station kamalajari-byrnihat including earthwork in cutting to
Drainage Tenders, Road Tenders, Tunnel Work Tenders, Wall Tenders