Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 486.59 lbcm of in-situ ob with conventional equipment at rg oc-iii expansion mine, rg-ii area for a period of 36 months.
Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 486.59 lbcm of in-situ ob with conventional equipment at rg oc-iii expansion mine, rg-ii area for a period of 36 months.
Drilling Work Tenders, Excavation Work Tenders, Labour Work Tenders, Land Levelling Tenders, Loading Work Tenders, Transportation Work Tenders