For Development of Boulder Moorum Topped Pavement between the two Railway Lines at the backup area of Berth No. 6 (ErstwhileBerth No.5), HDC, Haldia. <br />For development of Drainage System (Phase IB) at GC Berth area, Haldia Dock Complex under Master Drainage Plan. <br /> For Re-Construction of Inside Platform (IP) and Outside Platform (OP) Line near Transit Shed inside G.C. Berth, Haldia, Haldia Dock <br /> - -
For Development of Boulder Moorum Topped Pavement between the two Railway Lines at the backup area of Berth No. 6 (ErstwhileBerth No.5), HDC, Haldia.
For development of Drainage System (Phase IB) at GC Berth area, Haldia Dock Complex under Master Drainage Plan.
For Re-Construction of
Building Material Tenders, Drainage Tenders, Platform Tenders, Shed Construction Tenders, Stone Tenders