Tender Detail with Corrigendum

Corrigendum - 1 Published On : 10/08/2022
Corrigendum Details :Deadline has been changes from Aug 10 2022 12:00AM to Aug 23 2022 12:00AM
CORRIGENDUM No.1
Corrigendum Type :Date
Corrigendum Document : Available Corrigendum Document For Download
Buyer/Seller : Can be viewed by Subscribers
Ref. Number : 51715746 Tender Number : 2022_APRED_703083_1 Tender Prod. No : 2022_APRED_703083_1
Requirement : Rehabilitation of bt road from kt road @ 4/0 km to sasanam in palasa mandal, road portion, scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead upto 1000 m as per technical specification clause 305.4.3 morth including contractors profit & over head charges, but excluding gst etc., complete..or finished item of work., construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.1a), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller 8 t to achieve the desired density, complete as per technical specification clause 401 mord/morth including overhead charges & contractor profit, but excluding gst and seignorage charges etc., complete for finished item of work., providing, laying, spreading and compacting hbg graded machine crushed stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn / vibratory roller 80-100 kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406 mord/ morth, including overhead charges & contractor profit, but excluding gst and seignorage charges etc., complete for finished item of work., construction of shoulders by providing selected earth having mdd not less than 1.85g/cc with ll & pi not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to omc with vibratory roller of 80 to 100kn capacity to achieve the desired density, complete as per irc technical specification clause 303 mord 305, mort&h by using machinery including all over heads, and contractors profit, but excluding gst and seigniorage charges etc, complete for finished item of work., providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical specification clause 502 mord (for use on wet mix macadam & wbm), including overhead charges & contractors profit but excluding gst and seignorage charges etc., complete for finished item of work., providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503 mord,including overhead charges & contractors profit but excluding gst and seignorage charges etc., complete for finished item of work., providing and laying cement concrete wearing course m 30 grade including reinforcement complete as per drawing and technical specifications clauses 800 and 1206.3 mord and 2702 morth. excluding steel and its fabrication charges, including overhead charges & contractors profit but excluding gst & seignorage charges , providing, laying of close graded premix surfacing (mixed seal surfacing) material of 20mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (type 'b') as per specification 512 of morth, premixed with bituminous binder 60/70 grade (s-65, vg-30 bulk) @ 19.00 kg per 10 sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per morth specification 512 complete for finished item of work in all respects excluding gst and seigniorage charges as directed by engineer-in-charge., road safety interventions, providing and fixing of kilometre stones of size 350x250x1100 mm precasted with rcc (124) using 20 mm and 10 mm hbg metal and using 5 kgs/sqm of steel hysd bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size cement concrete m20 grade cc(124) using 20 mm and 10 mm hbg metal below ground level,painting ,lettering etc complete as per drawings and technical specification clause 1703 of mord including cost and conveyance of all materials, all labour charges, over head charges & contractors profit but excluding gst and seigniorage charges etc., complete for finished item of work., providing and fixing of hectometre stones of size mm 650x150x1100 precasted with rcc (124) using 20 mm and 10 mm hbg metal and using 5 kgs/sqm of steel hysd bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size cement concrete m20 grade cc(124) using 20 mm and 10 mm hbg metal below ground level,painting ,lettering etc complete as per drawings and technical specification clause 1703 of mord including cost and conveyance of all materials, all labour charges, over head charges & contractors profit but excluding gst and seigniorage charges etc., complete for finished item of work., providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per irc67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 mord fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with m15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 mord including cost and conveyance of all materials, all labour charges, over head charges & contractors profit but excluding gst and seigniorage charges etc., complete for finished item of work for equilateral triangle of size 600 mm., providing and erecting direction and place identification of semi reflective sign boards as per as per irc 67 made of 2 mm thick ms sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per mord specifications of required shade & colour supported & welded on two nos. of47mmx47mmx12swg sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm ms flat iron on edges on back firmly fixed to ground by mean of property designed foundation with m-15grade cement concrete 450mmx600mmx600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & contractors profit but excluding gst and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm, providing and erecting direction and place identification of semi reflective village boards as per as per irc 67 made of 2 mm thick ms sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per mord specifications of required shade & colour supported & welded on 47mmx47mmx12swg sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm ms flat iron on edges on back firmly fixed to ground by mean of property designed foundation with m-15 grade cement concrete 450mmx600mmx600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & contractors pr

Key Values

Tender Estimated Cost : 34,236,693
Closing Date : 23/08/2022
Location : Andhra Pradesh - India

Value Added Services

  • Get consortium partner
  • Get Winning Estimate
  • Track Tender Result
  • Get Subcontractors
  • Find Liaison Agency
  • Ask Expert

Disclaimer : Tender Tiger takes all possible care to ensure accurate & authentic tender information however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before they take submit their actual bid.