Requirement :
|
Supply, test, transport, construction, erection, testing and commissioning of new 33/11kv substation, additional/augmentation power transformer, ht line oh/ug, and other allied works, including five year guarantee for 6 major equipment (power transformer, conductor, switchgear & control gear (including 33 kv/11 kv breakers and panels), metering equipment, apfc and ht/lt cables) and 2 years defects liability period for works and minor items i.e. insulator, clamps, angles and channels etc under the ag policy 2020 project (acf) on single point responsibility, indivisible “turnkey” contract basis for the project completion period of 15 months as defined in these bidding documents (hereinafter referred to as "the works”), and as described in the bidding documents in circle.
|