Requirement :
|
Overhauling of associated/allied system of 08 nos. dhtc tower wagon i.e.(i) hydraulic lifting and swiveling platform along with dg set,(ii) fuel tank, hydraulic tank, transmission oil cooler and its associated pipe with gauge line including fuel gauge, oil level sensor,(iii) replacement of looking glasses and supply, commissioning of fog light & search light (iv) overhauling of cardon shaft,(v) overhauling of radiator.
|