Requirement :
|
Detailed survey, designing and drawing, construction of 42 mld capacity water treatment plant, sump (ips-1/cws-i) 6.90 lakh litre capacity cum pump house, sump (ips-2/cws-ii) 19.90 lakh litre capacity cum pump house, 22 nos. esr, staff quarter - 1 units, compound wall, supplying and laying clear water feeder main and distribution network, nala or river crossing, railway crossing, n.h. crossing, approach road, house connection, supplying and installation of centrifugal pump motor, and fiveyears operation & maintenance with allied works etc. all complete job for pakur block full coverage rural water supply scheme under division on turnkey basis. detailed survey, designing and drawing, construction of sump (ips-1/cws-i) 0.80 lakh litre capacity cum pump house, sump (ips-2/cws-ii) 2.40 lakh litre capacity cum pump house, 14 nos. esr, 1 no. gsr, 1 no. mbr, staff quarter - 1 units, compound wall, supplying and laying clear water feeder main and distribution network, nala or river crossing, n.h. crossing, approach road, house connection, supplying and installation of centrifugal pump motor, and five years operation & maintenance with allied works etc. all complete job for hiranpur block full coverage rural water supply scheme, under division on turnkey basis.
|