Construction Of Ponds And Installation Of The Remaining Taps Of The First Phase Of The Central Plain Of Minab, Along With Three Repairs Of The Water Transmission Line at Iran
Classified in :
#Overhead Reservoir
#Drinking Water Reservoir
#Rcc Water Storage Tank
#Drinking Water Scheme Repair
#Gravity Main
#Drinking Water Facility
#Gi Water Pipeline
#Gravity Main Laying
#Drinking Water Pipeline Repair
#Storage Water Tank
#Minor Irrigation Tank
#Gi Water Line
#Water Reservoir Tank
#Taps And Dies
#Drinking Water Distribution
#Drinking Water System Repair
#Reservoir
#Storage Reservoir
Key Values
Worth | : | 22590722527.0 |
EMD | : | 1129500000.0 |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 01-Feb-2022 |
Days to go | : | -1261 Days |
Opening on | : | 01-Feb-2022 |
Published on | : | 13-Jan-2022 |
Key Location
Location | : | Iran |
Address | : |
![]() |