Design And Execution Of The Works Related To The Investment Objective Electrification And Rehabilitation Of The Railway Line Cluj Napoca - Oradea - Bishopy Bihor, Lot 3 Poieni - Alesd And Lot 4 Alesd at Romania
Classified in :
#Interlocking
#Signaling Work
#Level Crossing Gate Repair
#Signalling Repair
#Signaling Repair
#Signal Repair
#Interlocking Repair
#Signaling Arrangement
#Signaling Gear Repair
#Panel Interlocking
#Traction Sub Station
#Railway Signaling
#Shunt Signal
#Route Relay Interlocking
#Panel Interlocking Work
#Electronic Interlocking Repair
#Electronic Interlocking System
#Overhead Equipment Work
#Electronic Interlocking Work
#Signaling System Repair
#Level Crossing Interlocking
#Catenary System
#Electrification Works
#Loop Line Repair
#Ohe Work
#Signaling Gear Replacement
#Interlocking System Repair
#Catenary Construction Work
Key Values
Worth | : | ₹ 4587535133.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 21-Feb-2022 |
Days to go | : | -1228 Days |
Opening on | : | 21-Feb-2022 |
Published on | : | 08-Jan-2022 |
Key Location
Location | : | Romania |
Address | : |
![]() |