Requirement :
|
Hiring of recovery works on several stretches of the SP-461 & SP-250 highways. Execution of Works, Lot 1 Recovery of the SP-461 runway - Rodovia Péricles Bellini, between km 94.76 and km 109.37, in the municipality of Nhandeara, with a length of 14.61 kilometers; Lot 2 Recovery of the SP-461 runway - Rodovia Péricles Bellini, between km 109.37 and km 124.00, in the municipality of Votuporanga, with a length of 14.63 kilometers; Lot 3 Recovery of the SP-250 runway - José de Carvalho Highway, between km 71.30 and km 100.98, stretch Ibiúna - Piedade, with an extension of 29.68 kilometers.
|