Requirement :
|
Construction of Water & Sewerage Infrastructure In Luapula Province. Water Supply Improvement Works in Mwense and Kawambwa (Luapula Province)- Lot 2, 1. Design & Construction of a new weir upstream on Mwense Stream and a gravity transmission line, 2. Construction of a conventional slow sand filters WTP (50 m3/hr - 1,200 m3/day capacity); 3. Minor repair works on the existing rapid modular plant and replacement of back wash tanks, valves, painting and pipework; 4. Supply & installation raw water gravity main from new intake pump house to new WTP & old WTP (9.6 km, ND 400 PVC); 5. Supply & installation treated water rising main from old WTP to Low Density new plots Elevated Tanks (0.8km, ND 150 DI); 6. Construction of the HL pump station at WTP to house 4 pumps); 7. Construction of a 1,000m3 clear well at the existing WTP to replace the existing one; 8. Construction of a 300m3 cold pressed steel panel tank at Low Density new plots; 9. Geotechnical investigations to confirm soil bearing capacity for proposed structures (to be undertaken by the Contractor as part of the works contract); 10. Replacement & extension of the water distribution network to new developmental areas (Matelo, Shingwe, Nsakulaba & Low Density new plots / Total 10 km of ND75 to ND 200 PVC) & Supply and Installation of bulk water meters (Total 10 no.); 11. Replacement of existing & installation of new water meters (Total 800 no. of Domestic & Non- Domestic, including service connections); 12. Construction of shared water taps in Matelo & Nsakaluba; 13. Installation of Telemetry system for the WTP & water tanks (Radio System); 14. Design & construction of new district office (single storey- floor area 190m2) for Luapula Water & Sewerage Company (LpWSC) in Mwense. 14. Existing Booster pump station at the WTP - Installation of 2 HL pumps (1D+1S) complete with motors for transmission to new Ntulo ET; 15. Supply & installation of a treated water rising main from WTP to Ntulo Tank (2.1 km, ND 100 DI); 16. Construction of a 500 m3 RC ground clear water tank & construction of 300 m3 cold pressed steel panel ET in Ntulo/Mutuna Village; 17. Replacement & extension of the water distribution network to new developmental areas (New Town, Part of Ntulo, Matelo & PWD area/ Total 33.5 km of ND75 to ND 200 PVC); 18. Supply & Installation of bulk water meters (Total 6 no.); 19. Replacement of existing & installation of new water meters (Total 970 no. of Domestic & Non- Domestic, including new service connections); 20. Construction of shared water taps in Matelo, Chadale & Ntulo/ Mutuna Village; 21. Installation of Telemetry system for the WTP and water tanks (Radio System); 22. Design & construction of new district office (single storey- floor area 190m2) for Luapula Water & Sewerage Company (LpWSC) in Kawambwa.
|