|
|
|
|
|
|
|
|
9. Sector : Water Storage and Supply
Tapi River Based DANGRegional Water Supply Scheme- (PKG-3)DANG District. Name of Project - “Working survey, Soil Investigation, Design, Build & Operate (with Trial Run of 3 Months) Contract for Providing, Supplying, Lowering, Laying & Jointing Rising Main, Gravity Main and Distribution Pipeline, Supply, Installation, Testing & Commissioning of HSCF/VT Pump With Associated Mechanical and Electrical Equipment’s, Instruments & Accessories, Clear water sump, Elevated Service Reservoir, Pump House, Staff Quarter, Compound Wall, Approach Road (R.C.C) at various HW/SHW/village with Operation & Maintenance of All type of Civil Structures, Mechanical Equipment & Pipeline Network for 10 years for 180 villages under Dang Regional Water Supply Scheme (PKG-3) based on Tapi River, Dist Dang.
|
Value :
323.04 Cr
*
|
3.23 Bn
*
|
Due Date :
6 Days to go
|
25/04/2024
|
TID :70514060
Gujarat
|
|
|
10. Sector : Civil Works
Cluster 02 C Under Amrut 2.0 1) Navsari WSS, 2) Navsari UGD, 3) Navsari Stp Scheme and 4) Augmentation Navsari WSS. Working Survey, Soil Investigation, Design & Construction, Testing & Commissioning of RCC Intake Structure with Approach Bridge, Conventional Water Treatment Plant, RCC Sump, ESR, Providing, Supplying, Lowering, Laying and Jointing MS/DI/PVC Pipeline Network, Providing, Supplying, Erecting and Testing of Pumping Machineries, Pumping Stations, Inlet Chamber. Flowmeter Chamber, RCC Road, Security Room, Compound Wall, Electrification Work, House Connection Work Etc. with Operation & Maintenance with All Allied Works for 5 [five] Years Including 3 [three] Years Defect Liability Period for Navsari-Vejalpore Nagarpalika Water Supply Project. Working Survey, Soil Investigation, Design of Underground Drainage Project, Work Including Providing, Supplying, Lowering Laying, Jointing, Testing & Commissioning of RCC Np3 Pipes for Sewer Collecting System - Gravity Mains and Di Pipes for Rising Main Pipeline, Construction of Sewage Pumping Station (SPS), Supplying, Erecting, Testing & Commissioning of Pumping Machineries, Construction of House Connections, Road Restoration, Providing and Supplying of Sewer Cleaning Equipments, Electrical Work Etc. with Operation & Maintenance with All Allied Works for 5 [five] Years Including 3 [Three] Years Defect Liability Period for Navsari Nagarpalika Underground Drainage Project. Working Survey, Soil Investigation, Design of Construction of STP 24 MLD. Work Including Soil Filling Work in Stp Plot Area, Design and Construction of Retaining Wall, Earth Work for Approach Road and Construction of Protection Wall for STP Plot Area Etc. with Operation & Maintenance with All Allied Works for 5 [Five] Years Including 3 [Three] Years Defect Liability Period for Navsari Nagarpalika 24 MLD STP. Augmentation Project at Navsari Nagarpalika (RAW Water Transmission Line and Intake Well with Approach Bridge, Including Chlorination Room, HT/LT Room, Toilet Block, Compound Wall, with Electromechanical and Instrumental Work at Purna River) with Operation & Maintenance with All Allied Works for 5 [Five] Years Including 3 [Three] Years Defect Liability Period for Augmentation Project.
|
Value :
252.62 Cr
*
|
2.52 Bn
*
|
Due Date :
11 Days to go
|
30/04/2024
|
TID :70494613
Gujarat
|
|
|