1. Sector : Dam Work
engineering, procurement and construction (epc) mode of contract "ashti lift irrigation scheme tq. ashti " under godawari marathwada irrigation development corporation, auragabad, including "investigation. design, construction, testing, commissioning of work thereafter operation and maintenance for 5 years of the entire scheme comprising of civil work such as approach channel, gated intake structure, fore bay. pump house, manifold, switchyard, rising main, delivery chamber and tail. channel. electrical and mechanical works, electrical supply from msetcl/msedcl substation through ht line, sanctioning of load, 33 kv switch yard, electrical and mechanical appurtenances, surge devices, various valves etc. for lifting 1.68 tmc water at a discharge rate of 9.18 cumecs in three stages from shimpora village tq. karjat dist. ahmednagar to khuntephal storage tanktal. ashti.
|
Value :
INR 1396.39 Cr
*
|
INR 13.96 Bn
*
|
Due Date :
24 Days to go
|
30/07/2022
|
TID :50682052
Maharashtra
|
|
|
|
|
|
|
|
|
8. Sector : Power Plant
Issue of nit for supply, installation, testing and commissioning of new 33/11 kv sub-station, 33 kv line and 11 kv line in sagar, damoh, chhatarpur, panna, tikamgarh, rewa, satna, sidhi and circles under rdss.
|
Value :
INR 120.37 Cr
*
|
INR 1.20 Bn
*
|
Due Date :
19 Days to go
|
25/07/2022
|
TID :50617954
Madhya Pradesh
|
|
|
9. Sector : Civil Works
Construction of inter disciplinary centre for science and human sciences block at university of hyderabad on epc basis with civil works including internal water supply & sanitary installations, sewerage system, drainage and development of site, internal roads and paths, external sewerage lines, external water supply lines, storm water drains, over head tank without independent staging, ug sump etc., and internal and external electrical installations, fans, power wiring and plugs, lighting conductors, telephone conduits, water supply pump sets, fire fighting with wet risers and sprinkle system, automatic fire alarm along with pa system, Supply installation Testing Commissioning of lifts, cctv and accesses control system, lan networking with wi-fi system, ip based epabx system, i/c Electrical & mechanical services Supply installation Testing Commissioning of 11kv substation, 3 phase ups system, vrv/vrf ac system, solar photo voltaic power generation system, integrated building management system, av and conference system etc. complete at hcu, gachibowli, hyderabad.
|
Value :
INR 120.17 Cr
*
|
INR 1.20 Bn
*
|
Due Date :
42 Days to go
|
17/08/2022
|
TID :50766579
Telangana
|
|
|
10. Sector : Power Plant
Supply, installation, testing and commissioning of new 33/11 kv sub-station, 33 kv line and 11 kv line in jbp(city), jbp(oanm), katni, mandla, dindori, narsinghpur, seoni, chhindwara, balaghat, shahdol, anuppur and umariya circles area under rdss.
|
Value :
INR 117.75 Cr
*
|
INR 1.17 Bn
*
|
Due Date :
14 Days to go
|
20/07/2022
|
TID :50527405
Madhya Pradesh
|
|
|