|
|
|
|
|
|
7. Sector : House / Building
Design, construction, testing, commissioning and operation & maintenance of infrastructure works at krishnapatnam node under chennai bengaluru industrial corridor (cbic) on epc basis" for development of following infrastructure works- roads, utilities and area landscaping, roads including cross drainage structures, bridges and area landscaping, potable water supply network including firefighting system, recycle water supply network, storm water drainage, residential sewage network, industrial effluent collection network, power, sewage/effluent pumping stations and rising main, water treatment plant (wtp), sewerage treatment plant( stp), common effluent treatment plant (cetp) within a period of 36 months and operation & maintenance (o&m) of 4 years from the date of completion of works.
|
Value :
INR 1054.63 Cr
*
|
INR 10.54 Bn
*
|
Due Date :
15 Days to go
|
20/07/2022
|
TID :50338249
Andhra Pradesh
|
|
|
8. Sector : Industrial Development Agencies
Design, Construction, Testing, Commissioning and Operation and Maintenance of Infrastructure Works at Krishnapatnam Node Under Chennai Bengaluru Industrial Corridor(cbic) on Epc Basis for Development of Following Infrastructure Works – Roads, Utilities and Area Landscaping, Roads Including Cross Drainage Structures, Bridges and Area Landscaping, Potable Water Supply Water Drainage, Residential Sewage Network, Industrial Effluent Collection Network, Power, Sewage/effluent Pumping Stations and Rising Main, Water Treatment Plant, Sewerage Treatment Plant, Common Effluent Treatment Plant Within a Period of 36 Month and Operation and Maintenance of 4 Years.
|
Value :
INR 1054.63 Cr
*
|
INR 10.54 Bn
*
|
Due Date :
15 Days to go
|
20/07/2022
|
TID :50344274
Andhra Pradesh
|
|
|
|
|