|
|
3.
Karnataka Tenders
Biz value: INR 620.33 Cr
Bid Before:22 March 202124 Days to go |
Krishna Bhagya Jala Nigam Limited |
Survey, investigation, preparation of designs, drawings, construction of head works including intake canal, jackwell cum pump house, pumping machineries, electrical sub-station, transmission line, terminal bay, rising main, delivery chamber etc, and construction of pipe distribution network including structures and scada compatible sluice valves, butterfly valves, flow meters, discharge control meters and air valves, scour valves,providing intermediate sump cum pump house including required c |
Tag a friend
Hashtag & Get Tender
Probable Participants
|
|
4.
Gujarat Tenders
Biz value: INR 325.18 Cr
Bid Before:01 March 20213 Days to go |
Gujarat Water Supply And Sewerage Board |
Design , build , testing & commissioning of intake well with approach bridge, pump house, rcc under ground sump / hglr, providing, supplying, lowering, laying, jointing, testing and commissioning of mild steel pipe for rising main and gravity main including sitc of pumping machinery and all allied work complete with post completion o and m for five years for ‘damanganga river basin (madhuban dam) based bulk water pipeline scheme'of valsad, pardi, taluka. |
Tag a friend
Hashtag & Get Tender
Probable Participants
|
|
|
6.
Andhra Pradesh Tenders
Biz value: INR 300 Cr
Bid Before:03 March 20215 Days to go |
Andhra Pradesh Power Generation Corporation Limited |
Design, engineering, manufacture, procurement, supply, delivery, transit & site storage insurance, storage, intra site transportation, construction/erection of all mechanical, electrical, instrumentation & control systems, civil, structural and architectural works of complete fgd plant, coordinated with btg & bop equipment and connecting with existing equipment/ systems without any damage of the same., site testing, commissioning, trail run, performance and guarantee tests and handing over of the complete fgd plant, training of o&m personnel, including guarantee period of 365 days from the date of completion of taking over of complete fgd plant of dr.nttps stage-v (1x800mw). |
Tag a friend
Hashtag & Get Tender
Probable Participants
|
|
|
|
|
|