Requirement :
|
Earth work in embankment, cutting and bridge approaches, construction of retaining wall, side drains and construction of minor bridges, RUBs supply of ballast shifting of S&T utility, shifting / dismantling of structure by ensuring safety of existing running line, cables, OHE etc from various km connection with doubling project. Earth work in embankment, cutting and bridge approaches, construction of retaining wall, side drains and construction of minor bridges, RUBs, supply of ballast shifting of S&T utility, shifting / dismantling of structure by ensuring safety of existing running line, cables, OHE etc from various km connection with doubling project. Earth work in embankment, cutting and bridge approaches, construction of retiring wall, side drains, RUBs supply of ballast shifting of S &T utility, shifting / dismantling of structure by ensuring safety of existing running line, cables, OHE etc from km 350 to Km 417 in connection with doubling project. Earth work in embankment, cutting and bridge approaches, construction of retaining wall, side drains and construction of minor bridges, RUBs supply of ballast shifting of S&T utility, shifting / dismantling of structure by ensuring safety of existing running line, cables, OHE etc from km 417 to in connection with doubling project.
|