|
|
|
4. Sector : Railway Ancillaries
Work of "Design & construction of Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without sump, Ramps, Seven (07) Underground Stations (Indore Railway station, Rajwada. Chota Ganpati, Bada Ganpati, Ramchandra Nagar, BSF/ Kalani Nagar and Airport) including Architectural Finishing, Plumbing (Water Supply, Sanitary Installation, Drainage Facilities and other Plumbing Work as directed by the Engineer) Works in entire Underground Section from chainage 5+862 to 14+482.347-14+488 for Indore Metro Rail Project - Tender Package IN-05R.
|
Value :
INR 2550 Cr
*
|
INR 25.50 Bn
*
|
Due Date :
3 Days to go
|
31/03/2024
|
TID :70386783
Madhya Pradesh
|
|
|
|
|
|
|
|
|